NAGA LIMITED POWER
The Company has adopted environment friendly renewable form of energy for meeting the power requirements of its various Divisions.
Currently, NAGA Power is happy to announce that it is generating sixty-five lakh units of power through “wind power” route. This is equivalent to fifty percent of the total one hundred thirty lakh units consumed by the entire group.
The Company’s objective towards the future is aimed at producing one hundred percent green energy for meeting the entire power consumption requirement of all its Divisions.
The Company owns six Wind Mills.
Three Wind Mills are supplied by M/s Vestas each having a capacity of 750 KW. Two of the windmills are installed in Pazhuvur (in Nagercoil District) and one windmill installed in Pattakuruchi (in Thenkasi District).
Two Wind Mills are supplied by M/s Enercon each having a capacity of 800 KW. Both these windmills are installed in a place known as Dharapuram.
One Wind Mill is supplied by M/s NEPC having a capacity of 225 KW / 40 is installed in a place known as Panangudi.
|
|